Coal mining enterprises of the Group of companies of Samruk-Energy JSC
Bogatyr Coal LLP
Chief Executive Officer
Rgaybek K.R.
Address
Republic of Kazakhstan, Pavlodar region, Ekibastuz, Bauyrzhan Momyshuly St., 23
Employees
6,239
people
Forum Muider Limited
ownership share
100%
Reserves and geography of the developed deposit
Balance coal reserves of Bogatyr Coal LLP as of January 1, 2025, amount to about
2.5 billion tonnes
including Bogatyr mine
1.2 billion tonnes
Severny mine
1.3 billion tonnes
Official company website
www.bogatyr.kz

Bogatyr Coal LLP supplies coal to the power plants of the Samruk-Energy JSC Group of companies and third parties located both in Kazakhstan and Russia, on market terms. The coal mines of Bogatyr Coal LLP are located 35 km from Ekibastuz GRES-1 LLP and 53 km from Ekibastuz GRES-2 JSC (distance by rail), which allows minimizing coal transportation costs for the Samruk-Energy JSC Group of companies. Most coal-fired power plants in Kazakhstan use the KSN-300 coal grade produced by Bogatyr Coal LLP.

Enterprise supply chain

Bogatyr Coal LLP mines KSN grade coal with an average calorific value of ~4,000 kcal/kg, ash content ~43%, moisture ~5%. The enterprise supplies energy coal for generating facilities of the domestic market of the Republic of Kazakhstan and exports to the Russian Federation, as well as supplies household coal to the domestic market. Coal for Kazakhstan’s thermal power plants is sold under direct supply contracts, for Russian thermal power plants – through a trader. Household coal is sold through commodity exchanges30.

Bogatyr Coal LLP holds the subsoil use right for coal mining at the Ekibastuz coal deposit within the Bogatyr and Severny open-pit mines in Pavlodar region of the Republic of Kazakhstan under Contract No.975 dated 29 June 2002. The Bogatyr open-pit, commissioned in 1970, is mining coal reserves in fields 5, 6, 9, 10. As of 1 January 2025, the pit depth reached 300 m from the surface (bottom elevation minus 100 m according to the Baltic height system).

The Severny open-pit was commissioned in 1955, coal is mined in fields 1, 2, 3, 4. As of 01.01.2025, the pit depth reached 260 m from the surface (bottom elevation minus 60 m according to the Baltic height system).

The balance coal reserves of Bogatyr Coal LLP as of 01.01.2025 amount to about 2.45 billion tonnes, including 1.2 billion tonnes at the Bogatyr open-pit mine and 1.25 billion tonnes at the Severny open-pit mine.

30 Order of the Minister of National Economy of the Republic of Kazakhstan "On Approval of the List of Exchange Traded Goods and the Minimum Size of Submitted Batches to be Sold through Commodity Exchanges" No.142 dated 26 February 2015.

Situational scheme of the Ekibastuz coal basin
Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 30,286 26,249 677
EBITDA, KZT million 37,425 32,911 20,936
EBITDA Margin, % 33 25 15
Amount of disbursed investments (50%), ‘000 KZT 16,070,953 12,368,588 9,378
Production figures
Indicator 2022 2023 2024
Coal production volume, million tonnes 42.5 42.9 42.7
Volume of coal sales in RoK, million t onnes 32.3 32.7 33.7
    to own power plants 19.5 19.4 20.2
    third-party ES 12.8 13.3 13.5
Coal export volume, million tonnes 10.1 9.8 9.3
ESG indicators
Indicator 2022 2023 2024
Emissions of pollutants, thousand tonnes 4.1 3.6 3.4
Average salary, KZT 391,643 505,800 551,146
Traditional energy enterprises of the Samruk‑Energy JSC Group of companies
Almaty Electric Stations JSC
Chairman of the Management Board
Mashirov E.K.
Address
Republic of Kazakhstan, Almaty, 7 Dostyk Ave.
Employees
2,971
people
Share of ownership of
Samruk-Energy JSC
100%
Official company website
www.ales.kz

Almaty Electric Stations JSC is a generating enterprise producing thermal and electric energy and supplying all consumer groups in Almaty city and the Almaty region. It covers about 70% of the needs of the city and region. AlES JSC is included in the Republican section of the state register of natural monopoly entities as a natural monopoly entity for the production and supply of heat and electricity for the Almaty region and Almaty city.

AlES JSC includes:

  • CHPP-1 named after B. Orazbayev, CHPP-2 named after A. Zhakutov, CHPP‑3 – heat and electricity generation;
  • Kapshagai HPP named after Sh. Chokin and Cascade HPPs – electricity generation;
  • Western Thermal Complex (WTC) – heat generation;
  • Production and Repair Enterprise Energoremont (PRP);
  • Fuel Reception and Unloading Center (FRUC).
Enterprise supply chain

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 4,306 1,321 19,043
EBITDA, KZT million 16,785 18,541 39,194
EBITDA Margin, % 19 19 31
Amount of disbursed investments, ‘000 KZT 11,036,602 14,277,526 105,440,749
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 1,235.7 1,235.7 1,235.7
Electricity generation volume, million kWh 5,099 5,055 5,196
Electricity sales volume, million kWh 4,591 4,530 4,596
Volume of heat production, thousand Gcal 5,282 5,852 6,091
Volume of heat sales, thousand Gcal 5,217 5,582 5,775
ESG indicators
Indicator 2022 2023 2024
Pollutant emissions, thousand tonnes 48.03 48.90 47.5
Discharges, tonnes 1.53 1.67 1.56
Average salary, KZT 433,391 482,932 571,663
Ekibastuz GRES-1 named after Bulat Nurzhanov LLP
Chief Executive Officer
Naurzgaliev A.A.
Address
Republic of Kazakhstan, Pavlodar region, Ekibastuz, Industrial Zone GRES-1, building 2
Employees
1,462
people
Samruk-Energy JSC
ownership share
100%
Official company website
www.gres1.kz

Ekibastuz GRES-1 named after Bulat Nurzhanov LLP is a condensing-type thermal power plant with a design capacity of 4,000 MW, including eight power units of 500 MW each. The station is located on the northern shore of Lake Zhegel’dy, 16 km north of Ekibastuz city. It is the largest thermal power plant in the country operating on solid fuel from the Ekibastuz deposits, the main power generating enterprise of the region, and one of the largest coalfired power plants in the world.

Enterprise supply chain

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 25,796 30,678 45,462
EBITDA, KZT million 72,267 71,803 92,443
EBITDA Margin, % 38 38 46
Amount of disbursed investments, ‘000 KZT 42,557,298 84,862,571 68,529,562
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 3,500 3,500 3 500
Electricity generation volume, million kWh 23,048 22,870 22,544
Electricity sales volume, million kWh 23,102 22,549 21,619
Volume of heat production, thousand Gcal 378 344 441.7
Volume of heat supply, thousand Gcal 143 142 135.7
ESG indicators
Indicator 2022 2023 2024
Pollutant emissions, thousand tonnes 242.813 238.9 234.3
Average salary, KZT 405,448 495,490 618,416
Station Ekibastuzskaya GRES-2 JSC
Chairman of the Management Board
Kashaganov B.Z.
Address
Republic of Kazakhstan, 141216, Pavlodar region, Solnechny settlement
Employees
1,368
people
Samruk-Energy JSC
ownership share
50%
Samruk-Kazyna JSC
ownership share
50%
Official company website
www.gres2.kz

Station Ekibastuzskaya GRES-2 JSC is a thermal power plant with an installed capacity of 1,000 MW (two power units of 500 MW each) and the world’s tallest chimney – 420 meters, listed in the Guinness Book of Records. The main fuel is high-ash coal from the Ekibastuz coal basin.

Enterprise supply chain

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 4,536 -17,322 -10,728
EBITDA, KZT million 27,365 20,102 34,501
EBITDA Margin, % 40 30 43
Amount of disbursed investments (50%), ‘000 KZT 12,457,528 2,710,689 6,611,681
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 1,000 1,000 1,000
Electricity generation volume, million kWh 6,002 5,659 6,045
Electricity sales volume, million kWh 5,938 5,532 5,823
Volume of heat production, thousand Gcal 172 206 217.5
Volume of heat supply, thousand Gcal 77.5 70 76.2
ESG indicators
Indicator 2022 2023 2024
Pollutant emissions, thousand tonnes 63.108 63.527 60.115
Average salary, KZT 361,870 428,589 611,068
Renewable energy facilities of the Samruk‑Energy JSC Group of companies
Shardara HPP JSC
Chairman of the Management Board
Kundakov AS.
Address
Republic of Kazakhstan, South Kazakhstan region, Shardara, Yelmuatova St., 13
Employees
135
people
Samruk-Energy JSC
ownership share
100%
Official company website
www.sharges.kz

Shardara hydropower plant with an installed capacity of 126 MW, with four units, is located in the middle reaches of the Syrdarya River and is the closing HPP of the Naryn-Syrdarya cascade. The main purpose of the hydro complex is to provide irrigated agriculture, the water regime is set by the Committee for Regulation, Protection and Use of Water Resources of the Ministry of Water Resources and Irrigation of the Republic of Kazakhstan, electricity is consumed in the Turkestan region. In Q1 2025, Shardara HPP JSC was transferred to the asset structure of Qazaq Green Power PLC.

Enterprise supply chain

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 1,939 2,624 2,999
EBITDA, KZT million 6,026 6,669 6,466
EBITDA Margin, % 69 74 75
Amount of disbursed investments, ‘000 KZT 53,754 22,414 129,802
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 126 126 126
Electricity generation volume, million kWh 518 529 583
Electricity sales volume, million kWh 540 549 577.4
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 413,506 478,067 656,192
AES Ust Kamenogorsk HPP LLP
Chief Executive Officer
Aidabulov T.I.
Address
Republic of Kazakhstan, Ust-Kamenogorsk Shlyuznaya 35
Employees
140
people
Samruk-Energy JSC
ownership share
100%
Official company website
www.ukges.kz

Ust-Kamenogorsk HPP is a hydroelectric power plant on the Irtysh River, located in the city of Ust-Kamenogorsk, East Kazakhstan Region. It is a part of the Irtysh HPP cascade, being its second, middle stage. Main function – generation of electric power and compensatory regulation of Irtysh river flow. In Q1 2025, AES Ust Kamenogorsk HPP LLP was transferred to the asset structure of Qazaq Green Power PLC.

Enterprise supply chain

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 2,674 2,763 5,029
EBITDA, KZT million 3,842 3,927 7,092
EBITDA Margin, % 42 48 65
Amount of disbursed investments, ‘000 KZT 1,809 1,070 1,871
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 367.8 367.8 367.8
Electricity generation volume, million kWh 1,659.8 1,465.5 1,891
Electricity sales volume, million kWh 1,731.1 1,507.1 1,882
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 450,981 564,941 724,672
AES Shulbinsk HPP LLP
Chief Executive Officer
Aidabulov T.I.
Address
Republic of Kazakhstan, Abai region, 071426, Semey, Shulbinsk, Promzona microdistrict, building 1
Employees
173
people
Samruk-Energy JSC
ownership share
100%
Official company website
www.shges.kz

Shulbinsk HPP is located 70 kilometres from the city of Semey, is the third station in the Irtysh HPP cascade and the largest HPP in Kazakhstan in terms of installed capacity.

Main function – electricity generation; designed for compensatory regulation of the Irtysh River flow, accumulation of the Ulba and Uba Rivers runoffs, providing spring flooding of floodplain meadows of Pavlodar region. In Q1 2025, AES Shulbinsk HPP LLP was transferred to the asset structure of Qazaq Green Power PLC.

Enterprise supply chain

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 3,182 4,500 8,883
EBITDA, KZT million 4,943 6,460 11,981
EBITDA Margin, % 49 57 72
Amount of disbursed investments, ‘000 KZT 2,193 2,388 3,509
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 702 702 702
Electricity generation volume, million kWh 1,553.4 1,631.7 2,057
Electricity sales volume million kWh 1,604.8 1,670.0 2,035
ESG indicators
Indicator 2023 2024
Average salary, KZT 562,417 692,015
Ust-Kamenogorsk HPP JSC
Director
Егоров А.В.
Legal address
Republic of Kazakhstan, Ust-Kamenogorsk city, Ablaketka settlement
Location of the executive body
Republic of Kazakhstan, Ust-Kamenogorsk city, 303, Kazakhstan str.
Samruk-Energy JSC
ownership share
89.99%
Main type of activity
Organisational and management activities

A joint stock company engaged in organisational and management activities

Bukhtarminskaya HPP JSC
Address
Republic of Kazakhstan, 070825, East Kazakhstan region, Zyryanovsk district, Serebryansk, Graftio St.
Employees
8
people
Samruk-Energy JSC
ownership share
96.32%
Main type of activity
Renting and managing your own property, leasing other machinery, equipment and tangible assets

Bukhtarminskaya HPP is an economical hydroelectric power plant in terms of both the specific volume of work and the cost of electricity production. The installed capacity of the HPP is 675 MW, and electricity generation for the reporting period amounted to 3,179,770 thousand kWh. The station provides coverage of peak loads in the power system of the Republic of Kazakhstan. In 2002, the Bukhtarma Dam was recognised as the best in the world in terms of concrete quality indicators. Currently, Bukhtarminskaya HPP is under lease.

Public company Qazaq Green Power PLC
Chief Executive Officer
Kasymbekov A.K.
Address
Republic of Kazakhstan, Astana, 15-A Kabanbai Batyr str.
Employees
12
people
Samruk-Energy JSC ownership share
100%

Qazaq Green Power PLC was established on November 4, 2022, with the aim of facilitating the modernization of existing and construction of new generating capacities, introducing new technologies in the energy sector, improving the efficiency of power systems, implementing investment projects of the Republic of Kazakhstan, as well as conducting energy-saving policies and ensuring environmental safety of energy facilities.

Financial performance
Indicator 2023 2024
Net income/loss, KZT million 2,245 3,181
EBITDA, KZT million 2,005 3,930
EBITDA Margin, % 85 87
Amount of disbursed investments, ‘000 KZT 11,874 120
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 568,718 1,297,570 2,244,991
Moynak HPP JSC
Chief Executive Officer
Zhanabaev B.K.
Address
Republic of Kazakhstan, Almaty region, Kegen district, Zhylisay rural district, Moynak village, 81
Employees
123
people
Qazaq Green Power PLC
ownership share
100%
Official company website
www.moynak.kz

Moynak HPP is located on the Sharyn River in the Kegen district of Almaty region. The station was built within the framework of the State Program for Accelerated Industrial and Innovative Development and in accordance with the Electricity Development Program of the Republic of Kazakhstan until 2030. The HPP successfully contributes to reducing the electricity deficit in the Southern zone of the Unified Energy System of Kazakhstan (Almaty, Zhambyl, Kyzylorda, and Turkestan regions), covers peak loads, and participates in power regulation in the energy system. Modern technological equipment ensures maximum automation and stability of the electricity generation process. The station is equipped with the latest modification hydro units, which have high technical parameters and efficiency.

Enterprise supply chain

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 9,981 10,738 14,115
EBITDA, KZT million 18,265 18,348 22,331
EBITDA Margin, % 80 84 87
Amount of disbursed investments, ‘000 KZT 102,925 606,884 1,286
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 300 300 300
Electricity generation volume, million kWh 973 832 1,071
Electricity sales volume, million kWh 1,014 912 1,183
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 535,611 570,153 776,445
First Wind Power Plant LLP
Chief Executive Officer
Botabekov R.K.
Address
Republic of Kazakhstan, Astana, Kabanbay Batyr St., 15-A
Employees
38
people
Qazaq Green Power PLC
ownership share
100%
Official company website
www.pves.kz

First Wind Power Plant LLP is Kazakhstan’s first project in the field of alternative energy sources development, which has passed all stages of preparation in accordance with the current legislation on support for renewable energy sources. Commissioned on August 14, 2015.

A wind farm consisting of 22 turbines, each with a capacity of 2.05 MW, is located in the Akmola Region, near the city of Ereymentau. Since its commissioning, the wind power plant has generated 1,428,158 thousand kWh of electricity.

Enterprise supply chain

Electricity sales are carried out from 01.07.2023 through the Single Buyer.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 2,248 3,045 3,231
EBITDA, KZT million 3,974 5,014 5,200
EBITDA Margin, % 80 81 78
Amount of disbursed investments, ‘000 KZT 157,852 475,875 774,329
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 45 45 45
Electricity generation volume, million kWh 135.72 142.60 137
Electricity sales volume, million kWh 135.37 142.31 137
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 604,532 724,813 882,310
Ereymentau Wind Power LLP
Chief Executive Officer
Nurgaliev A.K.
Address
Republic of Kazakhstan, Astana, 15-A Kabanbai Batyr str
Employees
9
people
Samruk-Energy JSC
ownership share
100%
Official company website
www.ewp.kz

Ereymentau Wind Power LLP implements the project “Construction of a wind power plant in the area of Ereymentau with a capacity of 50 MW”, and subsequently the production of electricity.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million (6,487) (10,949) (1,802)
EBITDA, KZT million (243) (312) (194)
Amount of disbursed investments, ‘000 KZT 1,064,760 0 0
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 846,798 845,186 855,393
Samruk-Green Energy LLP
Chief Executive Officer
Islamov D.U.
Address
Republic of Kazakhstan, Almaty, Amangeldy St., 70a
Employees
23
people
Qazaq Green Power PLC
ownership share
100%
Official company website
www.samruk-green.kz

Samruk-Green Energy LLP provides electricity generation services using RES, enabling the decentralization of electricity supply to remote areas.

Realised projects for the construction of facilities:

  • 2 MW solar power plant in Konajev;
  • 416 kW solar power plant in Konajev;
  • Solar power plant with a capacity of 1 MW in Almaty;
  • 5 MW wind power plant in Yenbekshikazakh district, Almaty region.
Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million (2,682) 622 147
EBITDA, KZT million 62 296 192
EBITDA Margin, % 15 59 29
Amount of disbursed investments, ‘000 KZT 35,463 23,866 31,678
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 8.4 8.4 8.4
Electricity generation volume, million kWh 19.78 21.52 21.01
Electricity sales volume, million kWh 19.53 21.23 23.84
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 481,180 576,464 700,790
Energia Semirechya LLP
Chief Executive Officer
Luo Jun
Address
Republic of Kazakhstan, Almaty region, Yenbekshikazakh district, Baiseit village, 92, Abaya str.
Employees
29
people
Share of ownership
Public company Qazaq
Green Power PLC
25%
Powerchina Chengdu Engineering Corporation Limited
15%
Powerchina Resources Limited
60%
Official company website
www.energy7.kz

Energia Semirechya LLP is an enterprise established in 2009 to implement the project “Construction of a wind power plant in the Shelek corridor with a capacity of 60 MW with the prospect of expansion up to 300 MW” and further provision of services for the production and sale of electric energy, design, and construction of facilities using renewable energy sources. In 2022, Energia Semirechya LLP completed the implementation of the investment project “Construction of a wind power plant in the Shelek corridor with a capacity of 60 MW”.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million (591) (85) (2,295)
EBITDA, KZT million 872 3,824 (137)
Amount of disbursed investments (25%), KZT ths. 4,946,597 56,112 5,963
Production figures
Indicator 2022 2023 2024
Installed electric capacity, MW 60 60 60
Electricity generation volume, million kWh 88.26 220.75 227.29
Electricity sales volume, million kWh 86.40 216.33 222.76
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 787,204 1,012,040 1,499,970
Kazhydrotechenergo LLP
Chief Executive Officer
Bukhanov M.E.
Address
Republic of Kazakhstan, Almaty, Mkr, Miras d. 99, 2nd floor, office 201
Employees
2
people
Qazaq Green Power PLC
ownership share
100%

Within the framework of the project “Expansion to 810 MW of RES project in Almaty region (Power China)” KGTE is working on the 1st stage – “Construction of 70 MW HPP on the Shelek River in Almaty region together with Powerchina”, the project is expected to carry out design and survey works and inclusion in the additional agreement to the signed MEA between the Republic of Kazakhstan and the PRC dated 12 November 2024.

Private Company Altyn Dala Energy LTD
Chief Executive Officer
Zharkenov B.K.
Address
Republic of Kazakhstan, Kabanbai Batyr Avenue, Building 15/1
Employees
2
people
Ownership share
Public company Qazaq
Green Power PLC
25%
Ownership share
Tumar Commerce LLP
75%

The Company was established in December 2023 to implement RES projects in the Republic of Kazakhstan.

ТОО «Семей Энерго»
Chief Executive Officer
Bimuratov B.Sh.
Address
RK, Astana, Kabanbai Batyr Ave., building 15A, block B, BC "Q"
Employees
1
people
Ownership share
Samruk-Kazyna JSC
50%
Ownership share
Samruk-Energy JSC
50%

On 17 April 2024, in order to implement the projects of construction of thermal power plants in the cities of Kokshetau, Semey and Ust-Kamenogorsk by building new coal-fired power units, an Agreement was signed between the Government of the Russian Federation and the Government of the Republic of Kazakhstan on the projects of construction of coalfired thermal power plants in the cities of Kokshetau, Semey and Ust-Kamenogorsk on the territory of the Republic of Kazakhstan. On 24 June 2024, Samruk-Energy JSC together with Samruk-Kazyna JSC established a joint legal entity in equal shares of 50% – Semey Energy LLP.

Energy Solutions Center LLP
Chief Executive Officer
Kystaubaev A.T.
Director of the CLC Branch
Esenbekov R.R.
Address
Republic of Kazakhstan, Ekibastuz, Kunaev St., 105
Address of the CLC Branch
Republic of Kazakhstan, Nur-Sultan, Kabanbay Batyr St., 15A
Employees
485
people
Samruk-Energy JSC
ownership share
100%
Official company website
www.e-s-center.kz

On 17.06.2024, an agreement was signed between the Akimat of Pavlodar region and Samruk-Energy JSC on the transfer of Ekibastuz CHP to trust management through Energy Solution Center LLP. Ekibastuz CHP was built in 1960 and is the oldest CHP in Pavlodar region. The installed thermal capacity is 750 Gcal/hour. Since 2023, a large-scale repair campaign has been carried out at the CHP.

A service organization for the administrative support of the Group of companies of Samruk-Energy JSC, providing services for IT infrastructure support, internet resources, real estate management (rental, acquisition, construction), special office services (personnel outsourcing), as well as transport services. From the moment of transfer of Ekibastuz CHP, it has been a Branch of Energy Solutions Center LLP – Shared Service Center.

Financial performance of Energy Solutions Centre LLP
Indicator 2024
Net income/loss, KZT million 299
EBITDA, KZT million 400
EBITDA Margin, % 9.45
Amount of disbursed investments, ‘000 KZT 4,074,092
Financial indicators of Energy Solutions Center LLP – Branch of DCO
Indicator 2022 2023 2024
Net income/loss, KZT million 73 102 104
EBITDA, KZT million 204 209 314
EBITDA Margin, % 13 13 16
Amount of disbursed investments, ‘000 KZT 107,511 9,536 659,391
Production indicators of CHPP
Indicator 2022 2023 2024
Installed electric capacity, MW 12.0 12.0 12.0
Electricity generation volume, million kWh 68.8 38.8 70.3
Heat supply, thousand Gcal 1,477 1,379 1,499
ESG indicators
Indicator 2022 2023 2024
Average salary (branch), KZT 537,600 618,161 709,614
Average salary (ETETS), KZT - - 507,598
Oskemen Energy LLP
Chief Executive Officer
Bimuratov B.Sh.
Address
RK, Astana, Kabanbai Batyr Ave., building 15A, block B, BC "Q"
Employees
1
people
Ownership share
Samruk-Kazyna JSC
50%
Samruk-Kazyna JSC
50%

On 17 April 2024, in order to implement the projects for construction of thermal power plants in the cities of Kokshetau, Semey and Ust-Kamenogorsk by building new coal-fired power units, an Agreement was signed between the Government of the Russian Federation and the Government of the Republic of Kazakhstan on projects for construction of coal-fired thermal power plants in the cities of Kokshetau, Semey and Ust-Kamenogorsk on the territory of the Republic of Kazakhstan. On 24 June 2024, Samruk-Energy JSC together with Samruk-Kazyna JSC established a joint legal entity in equal shares of 50% – Oskemen Energy LLP.

Kokshetau CHP LLP
Chief Executive Officer
Tyutebaev S.S.
Address
RK, Astana, Kabanbai Batyr Ave., building 15A, block B, BC "Q" (actual address: Astana, Turan Avenue, building 21/6, offices 304-305)
Employees
14
people
Ownership share
Samruk-Kazyna JSC
50%
Samruk-Energy JSC
50%

On 17 April 2024, in order to implement the projects of construction of thermal power plants in the cities of Kokshetau, Semey and Ust-Kamenogorsk by building new coal-fired power units, an Agreement was signed between the Government of the Russian Federation and the Government of the Republic of Kazakhstan on the projects of construction of coal-fired thermal power plants in the cities of Kokshetau, Semey and Ust-Kamenogorsk on the territory of the Republic of Kazakhstan. On 24 June 2024, Samruk-Energy JSC together with Samruk-Kazyna JSC established a joint legal entity in equal shares of 50% – Kokshetau TPP LLP.

On August 29, 2024, a Contract was signed between Kokshetau CHP LLP and Inter RAO – Export LLC (RF) for the development of the project “Construction of CHP in the city of Kokshetau”.

Distribution companies of Samruk-Energy JSC Group of companies
Alatau Zharyk Company JSC
Chairman of the Management Board
Asylov A.N.
Address
Republic of Kazakhstan, Almaty, 24 B Manas str.
Employees
3,896
people
Ownership share Samruk-Energy JSC
99.16%
AZhK JSC
0.84%
Official company website
www.azhk.kz

The electric grid company Alatau Zharyk Company JSC (AZhK JSC) is the largest power system in southern Kazakhstan, supplying electricity to all consumer groups in the city of Almaty and Almaty region. AZhK JSC represents the main part of the electric networks of the Almaty energy hub with networks of voltage classes 220/110/35/6–10/0.4 kV. The company’s task is to ensure reliable and high-quality electricity transmission, while reducing commercial and technical costs and improving the technical performance of substation equipment, in compliance with occupational health and safety and environmental protection rules.

Enterprise supply chain

Regional power grid companies perform the functions of electricity transmission from power generating organisations to end consumers via power grids within their balance sheet boundaries.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million 3,528 5,531 20,497
EBITDA, KZT million 14,394 20,789 34,014
EBITDA Margin, % 27 31 36
Amount of disbursed investments, ‘000 KZT 11,645,174 16,512,888 29,902
Production figures
Indicator Unit 2022 2023 2024
220 kV transmission line kilometres 410.34 410.34 409.6
110 kV transmission line kilometres 2,673.94 2,648.34 2,680.61
35 kV transmission line kilometres 2,546.06 2,452.58 2,451.13
10 kV transmission line kilometres 9,364.55 9,488.10 9,461.62
6 kV power line kilometres 140.36 136.93 138.72
0.4 kV transmission line kilometres 10,127.52 9,778.56 9,935.16
220 kV substation pcs. 8 8 8
110 kV substation pcs. 93 94 94
35 kV substation pcs. 106 106 104
Electricity transmission million kWh 8,154 8,686 9,259
Number of consumers (commercial and other) pcs. 12 12 12
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 352,818 425,296 476,979
AlmatyEnergoSbyt LLP
Chief Executive Officer
Islamova G.K.
Address
Republic of Kazakhstan, Almaty, Kozhamkulov St., 170A
Employees
518
people
Samruk-Energy JSC
ownership share
100%
Official company website
www.esalmaty.kz

AlmatyEnergoSbyt LLP is one of the largest energy supplying organizations in Kazakhstan, providing electricity to more than 3.6 million residents and more than 38 thousand enterprises in the city of Almaty and Almaty region. The company is part of the energy complex of Almaty and Almaty region, consisting of generation, regional transmission, and energy supply companies. The share of AlmatyEnergoSbyt LLP in the total supply of electricity to consumers in the country is 7%.

On July 8, 2024, the Law of the Republic of Kazakhstan On Amendments and Additions to Certain Legislative Acts of the Republic of Kazakhstan on Heat Power Engineering, Electric Power Industry, and Regulated Services was adopted, according to which transmission organizations are required to obtain a license for the type of activity of purchasing electricity for the purpose of supplying consumers by January 1, 2025. In turn, licenses issued to energy supplying organizations remain valid until January 1, 2025, and such energy supplying organizations are required to ensure the transfer of consumers to transmission organizations by January 1, 2025.

Thus, in order to comply with the requirements of the law, AlmatyEnergoSbyt LLP will cease its core activities from January 1, 2025, and Alatau Zharyk Company JSC will begin activities for supplying electricity to consumers.

Enterprise supply chain

Purchase of electricity from transmission organizations and sale to end consumers based on public energy supply contracts. The formation of the electricity tariff is carried out in accordance with the requirements of the Committee for Regulation of Natural Monopolies.

Financial performance
Indicator 2022 2023 2024
Net income/loss, KZT million (2,784) (3,207) 2,841
EBITDA, KZT million (3,369) (2,499) 3,581
EBITDA Margin, % (2.4) (1.48) 1.4
Amount of disbursed investments, ‘000 KZT 84,922 80,238 89,514
Production figures
Indicator 2022 2023 2024
Electricity sales volume, million kWh 6,847 7,085 8,736
Average electricity sales tariff, KZT/kWh 20.09 22.18 28.03
Total number of consumers by groups, persons 929,929 952,216 987,583
Population 891,214 911,097 943,134
Non-domestic consumers, including: 38,715 41,119 44,449
   Industrial and equated to them consumers 1,912 1,937 2,154
   Budget organisations 1,337 1,312 1,399
   Other consumers 35,466 37,870 40,896
ESG indicators
Indicator 2022 2023 2024
Average salary, KZT 396,047 445,453 501,331